Friday, August 6, 2010

Plywood makes an appearance

Tired of looking at my dimensional pine?  Here's some fir plywood for you!


This is the "subroadbed" for the tracks.  (You can also see 2 of the 3 steel leg sets in these photos.)  I've completed the plywood subroadbed in the isolated area above, which will eventually be a coal mining operation, the narrow section and lower level loop below:

...and a swing gate to connect them:


The lower level will not be seen in the finished model, there will be tracks and scenery above it.  This lower level will serve as "hidden staging" - up to 4 trains will be staged here, ready to be called on to negotiate the hidden loop, cross the swing gate, then climb at a 2% grade (about 1.1 degrees) to the upper, exposed level.  You can see that climb in the 1st photo - actually, the grade starts about 6" into the swing gate.

This alignment of subroadbed is the most critical of the entire railroad;  I decided to get it out of the way first, and it took a lot of time to get it right. But, I'm happy to say, it's right!

Next up will be some roadbed & track on this area - and where there's track, there will be trains!  Gotta test, right?  Also coming soon, beginning the electrical work, and hanging the backdrops on the walls, while I can still reach them.